Magura Bosch Parts & Service Ltd - Normanton on Soar Loughborough

This Floor was installed into an empty unit the customer wanted a storage floor by having a mezzanine floor this utilised the space within the unit a lot more efficiently.

The installation took 2 days and involved 54.00m² of flooring and a up and over pallet gate with staircase with mid-landing and handrail across the front.

 

 

 

 

Empty Unit    

 

 

Completed Mezzanine after 2 days 

                        

 

Website Update 

 

Our new and improved website is currently under construction and will be launched towards the end of the year, we cannot wait to show you all we will try and share some sneak previews before we launch !

 

 

Questions To Consider When Choosing Your Mezzanine Supplier

What is the process Involved getting a mezzanine floor:

 

Mezz9 try and make the process as easy as possible for you to start your mezzanine floor process. The easiest option is to go onto our website and click on get a new quote this will give us all the information needed from you here is the link Get a Quote (mezz9.com), or you can simply call us to discuss and we can take all the details we need over the phone.

Our team will create your quote according to your requirements a quote is sent across with all details and dimensions we will also discuss any building regulation requirements needed etc.,

If you are happy with your quote , you accept online and this starts the process, we will send a deposit invoice across for 25% we then come to site and take exact measurements for us to create a cad drawing for you We then send the drawing to yourself for sign off once you are satisfied with the layout and details, also if required we will then advise the building control company we use to get that process started for you .

Installation is then booked in with yourself.

Building control will come and see you and advise what is needed i.e., smoke detection, emergency lightening to get a final certificate for the floor issued.

 

 

Will I have a single point of contact:

 

Being a family run business, you will have access to one of the team Monday to Friday 9-5 this ensures a smooth process to ensure quality control and full safety measures are in place from start to finish. Sometimes it is noce to put a face to a name so please see the team below:

 

Stephen ( Director )

 

Michelle ( Sales & Office ) 

Nadine ( Office & Sales )

 

What Building Regulations Are Needed for a Mezzanine Floor:

 

Your mezzanine floor will require an application to the building control body before starting any work. The application can be sent to either your local authority or a privately approved inspector. Here at Mezz9 we will advise and guide you through the BCB application

. We will provide any drawings and calculations needed to gain approval from the BCB.

 

 

How Long Have You Been Installing Mezzanine Floors:

 

Established in 2005. We are a family ran business based in the midlands, we cover all the UK specialising in new & used mezzanine flooring. We have been in the fabrication trade for over 35 years, gathering a vast wealth of experience and knowledge along the way.

Our office team ensure all employees are fully up to date with all the below

 

Regular training both classroom and online

Online Health safety courses throughout the year

All certificates required to operate the relevant machines and be on site and re-test taken when required.

Risk and method statements sent for every installation, which include all our insurances and certificates for forklifts & scissor lifts.

 

 

 

Is Planning Permission Needed for a Mezzanine Floor?

 

In general, planning permission is not necessary when fitting a mezzanine floor. However, in certain cases it may be needed. If your premises include shared parking, or parking that belongs to a local council, permission will be needed before the flooring can be installed. If you are unsure, we can discuss this with you when quoting for your mezzanine installation / project.

 

 

 

 

 

 

If you would like to talk to one of the team, please contact us on 01162673808

or head over to our website and complete the online quote form which takes around 5 minutes

Get a Quote (mezz9.com)

 

 

 

 

 

 

Keep An Eye Out For Our Special Offers Starting 03rd October 2022